Tuesday, May 21, 2013

Final framing

Framing has officially been going on for 6 weeks.  Now they're finishing up the detail work which has been really fun.  I've been able to talk with the framer quite a bit and add my input.  It's amazing to see my ideas come to life.

This is the ceiling in the entry way (which I did not design, it was part of the plan):
 The family room fireplace with a little picture nook above it:
The kitchen ceiling.  It was supposed to be flat but Scott, the framer, suggested popping it up to match the other areas in the room.  I love how it turned out.
The ceiling in the office.  I love the exposed beam look so I wanted to incorporate that into the home.  It turned out great, can't wait to see them stained a dark color.
 The master bath, just need to cut a hole in it and drop the tub in.  Sounds easy enough, right?

No comments:

Post a Comment